Bethlehem LNG Project
PROJECT OVERVIEW
ACS was the general contractor who performed the civil, structural, mechanical, and electrical scopes for the project.
Bethlehem LNG Facility consisted of LNG storage tank, (3) BOG Compressors, (2) Boilers, Nitrogen system, Air system, Generator, PDC Building, Odorant Injection system, Vaporier tower, and Truck loading/unloading facilities.
START DATE
January 2020
END DATE
November 2020
LOCATION
Bethlehem, PA, USA
INDUSTRY
Energy Infrastructure
SERVICE
Electrical %%•%% Fabrication %%•%% Construction
CLASSIFICATION
Greenfield LNG Facility