Bergen Dairy Farm RNG Project
PROJECT OVERVIEW
ACS was the General Contractor for the project and performed site work, civil,structural, mechanical, and electrical scopes all in house.
Bergen Farm RNG Facility consisted of manure digester tank, gas processing equipment, HX building, Compressed Natural Gas equipment, Flare, Propane tank and equipment, High and Low temperature boilers, Heat exchangers, Bio-gas Ballon, H2Sscrubbers, Back-up generator, and Manure receiving pit.
START DATE
August 2023
END DATE
September 2024
LOCATION
Odessa, NY, USA
INDUSTRY
Energy Infrastructure %%•%% Power Generation
SERVICE
Electrical %%•%% Fabrication %%•%% Construction
CLASSIFICATION
Greenfield Dairy RNG Facility