Bergen Dairy Farm RNG Project 

ACS was the General Contractor for the project and performed site work, civil,structural, mechanical, and electrical scopes all in house.

Bergen Farm RNG Facility consisted of manure digester tank, gas processing equipment, HX building, Compressed Natural Gas equipment, Flare, Propane tank and equipment, High and Low temperature boilers, Heat exchangers, Bio-gas Ballon, H2Sscrubbers, Back-up generator, and Manure receiving pit.

START DATE

August 2023 

END DATE

September 2024

LOCATION

Odessa, NY, USA

INDUSTRY

Energy Infrastructure %%•%% Power Generation

SERVICE

Electrical %%•%% Fabrication %%•%% Construction

CLASSIFICATION

Greenfield Dairy RNG Facility